Serial No.ParticularsRemarks
1Total installed capacity600 Kgs per day wet/ (40% Output)
2Land & Building Required1000 Sq. Mtr. Covered Area
3Required Manpower22-25
4Electric Load100 HP
5Cost of Plant and Machinery1Cr. to 3 Cr.